Author Topic: Weekend Update 9/22/24  (Read 3316 times)

0 Members and 1 Guest are viewing this topic.


peteski

  • Crew
  • *
  • Posts: 32934
  • Gender: Male
  • Honorary Resident Curmudgeon
  • Respect: +5336
    • Coming (not so) soon...
Re: Weekend Update 9/22/24
« Reply #1 on: September 20, 2024, 07:30:43 PM »
+7


Now that's cool!
. . . 42 . . .

shark_jj

  • Crew
  • *
  • Posts: 294
  • Respect: +671
Re: Weekend Update 9/22/24
« Reply #2 on: September 20, 2024, 10:25:11 PM »
+16
I didn't make any progress on the layout for a couple of weeks as my wife decided to get new carpet for the 3 bedrooms.  This job morphed into replacing all of the interior doors on the main floor, put new trim in all 3 bedrooms, paint all 3 bedrooms, and oh yes put new carpet in all 3 bedrooms and for good measure lets purchase a new sofa and love seat for the living room.  The contractor will be here Tuesday.  With everything sorted out, a schedule in place and the Open House Tour only 2 weeks away, I took a couple of days and tackled a couple of scenery projects I wanted to get done before the tour.

First up was to finish the area in front of the backdrop in the Gavinsport area.  I recently posted about this area where I had cut in a new roadway.  To finish this area off, I had to daylight the tunnel portal as my 40 ft Hi Cubes weren't clearing the portal.  Used the same solution as the prototype and opened up the sides of the portal.  I also didn't like the retaining wall on the left side of the portal, so I ripped it out and added a new rock casting to the left, and also cut into the hillside on the right and added a casting there.  Basic ground cover was added and then trees and bushes.  Sounds simple but it was about 6 or 7 hours of work and I still need to add some additional ground cover to finish it off.  I like to work my scenery back to front, so with the background scenery complete I can move on to ballasting the track and then the foreground scenery. 

This photo shows the progress after I had added the castings and new plaster.  You can see that the tunnel portal has been filed open to accomodate the HiCubes.



Here we look toward the left side of the tunnel portal.  The casting have been painted and ground cover, trees and bushes have been added.



In this photo we see the area to the right of the tunnel portal and again the casting has been painted and trees and bushes added.  Additional ground cover still needs to be added in this area.



The second area I tackled was at the throat of the Helix Staging Yard.  I had done the foreground and the background but the mid part of the scenery was just a short hillside.  I thought it needed a little something so I cut in a small road, added a retaining wall made up of  left overs from other retaining walls I had cut.  Like most model railroader I never throw anything out, I new all those little 1/2" pieces of retaining wall would be good for something some day.  I had a tower I had picked up at an estate sale for free since no one wanted it so it will go in here.  When I have a little time it will get a better paint job and of course I added ground cover, trees, and bushes.  Here's a couple of photos.

In progress, the road has been cut in plastered and a base coat of paint added.  The retaining wall is in place and painted.



Here's where we are at currently. 



More info being posted on the Grand Trunk Southern thread. 
https://www.therailwire.net/forum/index.php?topic=26250.150
John

eja

  • Crew
  • *
  • Posts: 1403
  • Gender: Male
  • Respect: +212
Re: Weekend Update 9/22/24
« Reply #3 on: September 21, 2024, 12:22:28 AM »
+1
Carved pencil ...

... that is amazing.

Do you think it is really hand carved, or lazar cut ? In either case, the results are fantastic and I cannot begin to imaging the time involved.  Also, one wonders how many Aw Sh**'s were involved before the final result manifested itself.
« Last Edit: September 21, 2024, 12:28:08 AM by eja »

eja

  • Crew
  • *
  • Posts: 1403
  • Gender: Male
  • Respect: +212
Re: Weekend Update 9/22/24
« Reply #4 on: September 21, 2024, 12:26:45 AM »
+1
I didn't make any progress on the layout for a couple of weeks as my wife decided to get new carpet for the 3 bedrooms.  This job morphed into replacing all of the interior doors on the main floor, put new trim in all 3 bedrooms, paint all 3 bedrooms, and oh yes put new carpet in all 3 bedrooms and for good measure lets purchase a new sofa and love seat for the living room. 


What ? No bathroom remodel too?   Lucky man. Lucky wallet.

up1950s

  • Crew
  • *
  • Posts: 9749
  • Gender: Male
  • Respect: +2307
Re: Weekend Update 9/22/24
« Reply #5 on: September 21, 2024, 02:25:40 AM »
0
I didn't make any progress on the layout for a couple of weeks as my wife decided to get new carpet for the 3 bedrooms.  This job morphed into replacing all of the interior doors on the main floor, put new trim in all 3 bedrooms, paint all 3 bedrooms, and oh yes put new carpet in all 3 bedrooms and for good measure lets purchase a new sofa and love seat for the living room.  The contractor will be here Tuesday.  With everything sorted out, a schedule in place and the Open House Tour only 2 weeks away, I took a couple of days and tackled a couple of scenery projects I wanted to get done before the tour.

First up was to finish the area in front of the backdrop in the Gavinsport area.  I recently posted about this area where I had cut in a new roadway.  To finish this area off, I had to daylight the tunnel portal as my 40 ft Hi Cubes weren't clearing the portal.  Used the same solution as the prototype and opened up the sides of the portal.  I also didn't like the retaining wall on the left side of the portal, so I ripped it out and added a new rock casting to the left, and also cut into the hillside on the right and added a casting there.  Basic ground cover was added and then trees and bushes.  Sounds simple but it was about 6 or 7 hours of work and I still need to add some additional ground cover to finish it off.  I like to work my scenery back to front, so with the background scenery complete I can move on to ballasting the track and then the foreground scenery. 

This photo shows the progress after I had added the castings and new plaster.  You can see that the tunnel portal has been filed open to accomodate the HiCubes.



Here we look toward the left side of the tunnel portal.  The casting have been painted and ground cover, trees and bushes have been added.



In this photo we see the area to the right of the tunnel portal and again the casting has been painted and trees and bushes added.  Additional ground cover still needs to be added in this area.



The second area I tackled was at the throat of the Helix Staging Yard.  I had done the foreground and the background but the mid part of the scenery was just a short hillside.  I thought it needed a little something so I cut in a small road, added a retaining wall made up of  left overs from other retaining walls I had cut.  Like most model railroader I never throw anything out, I new all those little 1/2" pieces of retaining wall would be good for something some day.  I had a tower I had picked up at an estate sale for free since no one wanted it so it will go in here.  When I have a little time it will get a better paint job and of course I added ground cover, trees, and bushes.  Here's a couple of photos.

In progress, the road has been cut in plastered and a base coat of paint added.  The retaining wall is in place and painted.



Here's where we are at currently. 



More info being posted on the Grand Trunk Southern thread. 
https://www.therailwire.net/forum/index.php?topic=26250.150

Really nice blend to the background scene .


Richie Dost

craigolio1

  • Crew
  • *
  • Posts: 2452
  • Respect: +1763
Re: Weekend Update 9/22/24
« Reply #6 on: September 21, 2024, 06:46:53 AM »
+18
Lots of progress on 20 Prospect Ave this week. The bulk of the structure of the house is done now.













More in the build thread.

https://www.therailwire.net/forum/index.php?topic=49229.45

Craig


chessie system fan

  • Crew
  • *
  • Posts: 1156
  • Gender: Male
  • Respect: +654
Re: Weekend Update 9/22/24
« Reply #7 on: September 21, 2024, 02:42:56 PM »
+6
I've been making trees every night. Nothing photo-worthy there yet.  But I did visit the Citronelle, Alabama depot this morning. 

 

It has been moved about a block from its original location.  One hundred years ago, it had tracks on either side of it.

They have an old baggage car and an old reefer there, but they also have this old Frisco shop crane too that just begs to be modeled.  Fortunately, I had the foresight to bring along my tape measure.





Aaron Bearden

chuck geiger

  • Crew
  • *
  • Posts: 3256
  • Gender: Male
  • Las Piedras Railroad - Destination Desert
  • Respect: +2825
Re: Weekend Update 9/22/24
« Reply #8 on: September 21, 2024, 04:03:08 PM »
+14
So a few weeks ago Tom Garza from Scalesigns.com sent me a beta test of his N Scale modern billboards.
He is introducing them before the grade crossing signal cantilevers, which are coming in November-December.
This double board may or may not be introduced, there will be a single on each side that will have ladders and railings on the
side for board workers. I suggested name plates for the board owner, i.e. Lamar, and Gannett. There are some
bugs to work out and the N Scale, like the HO will eventually have lighting options. All of the boards will have
signage from all of his HO boards on the website.








« Last Edit: September 21, 2024, 04:13:34 PM by chuck geiger »
Chuck Geiger
provencountrypd@gmail.com



randgust

  • Crew
  • *
  • Posts: 2758
  • Respect: +2260
    • Randgust N Scale Kits
Re: Weekend Update 9/22/24
« Reply #9 on: September 21, 2024, 09:31:03 PM »
+21
Well, the Altoona N scale weekend was pretty good for me... at least while I was there!  (Ed can explain).

I got over to Todd's layout, first time, and was just stunned - particularly in things I didn't know had happened, like the Pittsburgh backdrop upgrade.   The fact that Todd is still all DC, Code 80, Atlas switches...and one of the finest N scale layouts of all time, yeah, that I can relate to!

I've probably had the Ross Run logging module underway for maybe....five years?  Chris333 was ragging on me to finish it, I really pushed this summer to do that.

You can see how well this links up with the original Hickory Valley Railroad layout (18x36) and Ross Run is 21x42)



link:  http://www.randgust.com/Ross%20Run%20Module%201%20sm.jpg

The 30-ton scratchbuilt Climax B and the 25-ton scratchbuilt Shay both got great reaction and ran surprisingly well.  The Atlas Shay again shed a crank after about 30 seconds....I just got it repaired tonight.  But considering that the Hickory Valley sawmill module was built in 1976, not bad, not bad at all.



link: http://www.randgust.com/Ross%20Run%20Module%202%20sm.jpg

But the scene I was REALLY after was the log landing, I have a prototype photo of this with the W&D Heisler in it, and when desaturated to black & white, yeah, finally got it.



link:  http://www.randgust.com/Ross%20Run%20Logging%201%20BW%20sm.jpg

Altoona has a crowd-selected 'best of show' award named in Mike Phillips honor.   Considering the competition (see the Altoona Model Railroaders facebook page to see all the entrants) I was more than a little surprised when I got 'best of show'.   



link:  http://www.randgust.com/Altoona%202024%20best%20in%20show%20sm.JPG

MK

  • Crew
  • *
  • Posts: 4065
  • Respect: +772
Re: Weekend Update 9/22/24
« Reply #10 on: September 21, 2024, 09:40:03 PM »
+1
Congratulations Randy!  You deserved it!  It's like the Grand Canyon, seeing it in pictures doesn't convey its greatness.  You really need to see it in person.

(BTW, thank you for being the first one to recognize and thank me for the blood, sweat and tears in getting the Combined T-Trak running after hours of troubleshooting on Saturday morning.)

ednadolski

  • Crew
  • *
  • Posts: 4809
  • Respect: +1756
Re: Weekend Update 9/22/24
« Reply #11 on: September 21, 2024, 10:11:43 PM »
+11
Debut of my first Z-Bend module today -- more info here: https://www.therailwire.net/forum/index.php?topic=58116.msg805998#msg805998



Cheers,
Ed

DirtyD79

  • Crew
  • *
  • Posts: 322
  • Gender: Male
  • Respect: +163
Re: Weekend Update 9/22/24
« Reply #12 on: September 21, 2024, 11:54:28 PM »
0
So a few weeks ago Tom Garza from Scalesigns.com sent me a beta test of his N Scale modern billboards.
He is introducing them before the grade crossing signal cantilevers, which are coming in November-December.
This double board may or may not be introduced, there will be a single on each side that will have ladders and railings on the
side for board workers. I suggested name plates for the board owner, i.e. Lamar, and Gannett. There are some
bugs to work out and the N Scale, like the HO will eventually have lighting options. All of the boards will have
signage from all of his HO boards on the website.









I saw the HO scale ones they got. I like those ones better than the Walthers ones because it's much easier to change out the signs.
I'll eat anything you want me to eat and I'll swallow anything you want me to swallow so come on down and I'll...chew on a dog! Howwwwwwwwl!!!!!!

Tad_T

  • Crew
  • *
  • Posts: 192
  • Gender: Male
  • Respect: +118
Re: Weekend Update 9/22/24
« Reply #13 on: September 22, 2024, 07:50:12 AM »
0
Congratulations, Randy!
Tad

The “All Day & Night” Railway Company

Dwight in Toronto

  • Crew
  • *
  • Posts: 656
  • Respect: +376
Re: Weekend Update 9/22/24
« Reply #14 on: September 22, 2024, 08:17:05 AM »
0
Speaking of Altoona … my only disappointment was that ESU did not have a booth. 
I’m guessing that Montoursville PA can’t have been THAT far away, right?