I installed about 15 Blue Point turnout controllers today. Not hard, but it takes a while to do.
I now have almost every turnout that comes off the mains controlled with a Blue Point.
Since my facia is not installed yet, I haven't run to control cables yet; I'm just operating them by sticking my hand under the layout and throwing the controller manually. Not perfect, but it works for now.