Hi Gang
Although I would prefer to use the bridge track that comes with the Atlas through truss bridge. It does not seem to be available any more, that is if it were ever available as a separate part any time before. I like it because it comes with a guard rail molded in place.
My next preference which is available, is the Micro Engineering flex bridge track. I have used Micro Engineering's bridge track before but have had trouble keeping the guard rail bonded to the ties (thus the preference for the unavailable atlas bridge track). This Micro Engineering's bridge track offers small indicator moldings on each tie for the guard rail to fit in between and help keep the guard rail aligned. These indicators maybe the culprit interfering with a good bond, haven't checked that yet but I thought I would post the question here on the Railwire. I welcome thoughts, experience and suggestions by the way I am using code 55.
Thanks