0 Members and 1 Guest are viewing this topic.
I know these mini layouts are a bit of fantasy, but I like to try and follow prototype by using real locomotives and rolling stock. The On30 guys can get out of hand sometimes. Modeling this quarry operation will allow me to use more of the prototype. The line crossed over and ducked under the local roads and those bridges are still there to try to follow. If it wasn't for the USGS aerial photos from 1950-1970 I would have no idea how the tracks were laid out.Plus now I get to build even more Nn3 locomotives and cars This quarry was in operation from 1894-1984 so I can change out the diesels for steam and swap the crane for an older steam shovel.Cody, I'd send the old to you if you left the gauge alone It is only 11x17x3" and its a runner: />