0 Members and 1 Guest are viewing this topic.
Take the right hand mainline turnout in the bottom middle of this photo and change it to a left hand turnout, which will change the angle of the single track mainline heading towards that corner. That will move the mainline away from the corner and should allow you to connect to Elkins without a sharp curve. By also changing the industry track's turnout from the mainline to a right hand turnout (hey- you can swap these turnouts at zero cost to you!) and a little track realignment, you should be able to easily reconnect to the industry trackage at the back of your layout without disturbing those turnouts back there.DFF
I like Ed's idea.Considering the areas you model (deep South) are you going to do any swampy areas? Wooden treste over a swamp would look really cool.
Not much swamp between the prototype refinery and the KCS yard in Baton Rouge - it's all been filled in.But this dock on the Mississippi River and its marsh are already underway on the opposite side of the room:http://binged.it/122sriC