0 Members and 1 Guest are viewing this topic.
Besides Baldwins, I think FM diesels, switchers especially, are lacking too.
I was thinking how N scale has finally matured.What I mean is--- with a few exceptions, many/most of the major locomotives have been done.We are now getting to a point when more minor locomotives are being done.How much longer before someone announces an AS616?
Things are better than ever though. Personally I'm still hoping for state of the art SD40-2s.
Still lots of locos to be done ...U30B (glaring hole here)U28BC425C430GP9 Phase 3Late GP40Late SD40Various switchers noted above.Things are better than ever though. Personally I'm still hoping for state of the art SD40-2s. Mark
Ditto on the GP30.Jason
... or a GP40-2LW , but I agree things are a lot better than before !!!