0 Members and 2 Guests are viewing this topic.
Coxy, I had no doubt you were intimately familiar with the proto RPRC (far more so than I am, I might add). I just tossed the schematic out there to stir the pot a bit - because it has such interesting ops potential. Funny that you mention Crockett and Benicia because I was thinking that your visible main looks a lot more like that area - with its numerous curves - than it does Richmond/San Pablo. That concept works much better for me as a back story than does Richmond.In any case, all that matters is what works for you, and you have clearly thought this through in great detail. Indeed, your reasoned and articulate defense prove to me that you have no excuse to not begin construction now! Just make it modular, so you can move it when the time comes. There is no substitute for a living, breathing layout.-gfhP.S. Where is the prototype Hensley industrial area? Is that the area adjacent to the flyover?
Coxy,Per your request, I was able to add an image of my adjustable-height layout castors to my last post on the previous page.MH
Awesome, thanks Mark!! Looks great and gives me a good idea of how to proceed.Coxy
This is serious stuff man ()! Getting feedback is the reason I piped up and posted the plan and shared my thinking so I'm very pleased with the discussion so far.
It's interesting you raised the 'fit' of the back story. Now I'm located in Toronto, I hadn't thought much about operators being familiar with the Richmond area. This thread is helping a lot to clarify that back story. I'm realizing that getting the story right is important for proto-freelancers to minimize disconnect between the plan and the prototype.
Who knows, I may have some pictures of wood in the next update!