0 Members and 1 Guest are viewing this topic.
I was only able to salvage about what was needed. I can always buy more.
BTW, if you have a paint program that can handle really big files--and also have paper and toner to spare--you can print out a 1:1 image of the IT part of the plan with this:http://whiteriverandnorthern.net/images/ian_1to1.jpg
Its the opposite of the Mail 412. I will have to dig out the books and get back to youBrian
Updated the train list...adding the Guilford Rail trains. https://spreadsheets.google.com/pub?key=0AoBbkONDqsLIdHFnV3ljOERwWTRIcWg5d3J6WEJNbEE&hl=en&output=html
That ought to keep you busy!
Dave,While at an ops session at John's house (MEC_FAN), Jon Landry (central.vermont) and I noticed what may be a switching issue. The issue is pointed out with the red arrow.With all those industries to switch, I'm figuring about 10-15 cars for a train. The way it is set up now, do you think there is significant room to pull into that track at Fiberoid and be able to run around your train without cutting it twice so that you can go switch the other industries on the left side of the IT?
I know it isn't prototypical for that location, but could you put a wye in that space, combining the two designs Dave has? That might ease concerns operating that area,
Excellent suggestion, Phil! I leave it up to Ian to decide, but I think it would add quite a lot of versatility there.
It would require the use of a polarity reverser module .. $25