Author Topic: Richard Newmiller MMR, PRR Dresher Division  (Read 391 times)

0 Members and 1 Guest are viewing this topic.

Bfagan

  • Crew
  • *
  • Posts: 321
  • Respect: +62
Richard Newmiller MMR, PRR Dresher Division
« on: February 19, 2024, 05:01:47 PM »
0

Richard Newmiller MMR, PRR Dresher Division
 
Construction started 8/2016, and the layout was completed in 7 years.
 
This free-lanced prototype HO scale layout set in the mid-1960s is a walk-in design occupying a 14 ft. x 20 ft. area with 490’ of track. The dual track mainline leaves Greenwich yard, climbs a 2.25% grade into the mountains and interchanges with the saw mill and logging businesses. Operations are enhanced with 3 staging tracks, team tracks, passing sidings, multiple crossovers and 28 switching sidings that serve 30 customers. The NCE-DCC layout has multiple scratch built, exceptional quality structures, 3 of which earned the Best-in-Show award in judged NMRA contests. Scenery is complete, all motive power is sound equipped.
 
Mainline Eastbound:       
/>
Mainline Westbound:       
/>
Caboose View Mainline: 
/>
Logging Westbound:       
/>
Flyover:                           
/>
Slide Show:                     
/>