Thanks to Rob Chant of jomrd.com here's the Great Divide Railway & Mining Co trackplan of the line from Mourilyan to Ravenshoe with room to expand to a second level.
20x30ft total.
The GD is freelanced based in North Queensland, Australia.
This is HO scale, train lengths are roughly 9ft (2x locos, 20x ore cars)
26" curves minimum and grades are planned to max at 2%. Empties uphill, loads down.
Operations are straight forward, the roster will consist of roughly 10x locomotives, 2x dedicated to switching, working the mine fuel/supply train and MoW with the other 8x pairing up to haul the ore trains. Ore trains arrive at the holding yard behind the ore dock and wait their turn to unload, the yard is used to store excess ore cars and allowing trains to swap locomotives before heading back to the mine.
I'm looking for another set of eyes to look over it, thoughts?