Welcome,
Guest
. Please
login
or
register
.
1 Hour
1 Day
1 Week
1 Month
Forever
Login with username, password and session length
Home
Help
Gallery
Search
Stats
Login
Register
TheRailwire
»
General Discussion
»
N and Z Scales
»
Reusing track for new layouts -- pro or con?
« previous
next »
Print
Pages: [
1
]
Go Down
Author
Topic: Reusing track for new layouts -- pro or con? (Read 1524 times)
0 Members and 1 Guest are viewing this topic.
OldEastRR
Crew
Posts: 3412
Gender:
Respect:
+311
Reusing track for new layouts -- pro or con?
«
on:
February 19, 2015, 03:24:14 AM »
0
Some guys buy all brand-new track and throw away what was on the old layout, some guys save part or all of their trackage from layout to layout. If care is taken to make absolutely smooth and flawless roadbed does it matter if you use new or recycled track on a new layout? Obviously I mean used track in reasonable or excellent condition.
Logged
Viperjim1
Crew
Posts: 133
Respect:
+8
Re: Reusing track for new layouts -- pro or con?
«
Reply #1 on:
February 19, 2015, 04:15:12 AM »
0
I think there is no problem at all with recycling track as it's easier on the pockets , just be careful of the soldering and u soldering to many times as this might play a role on the ties even if you cut them back..
Logged
mplsjct
Crew
Posts: 502
Respect:
+435
Re: Reusing track for new layouts -- pro or con?
«
Reply #2 on:
February 19, 2015, 07:21:03 AM »
0
I always re-use old track, it's a cost saving maneuver.
Logged
I’m not here to argue
randgust
Crew
Posts: 2758
Respect:
+2262
Re: Reusing track for new layouts -- pro or con?
«
Reply #3 on:
February 19, 2015, 08:36:37 AM »
0
One thing there is absolutely no economy on is saving old rail joiners. Between oxidation and damage getting old track apart, those should always be 100% new.
Down in the depths of my hidden staging tracks, I've got some truly vintage flex-track (remember the massive Trix flex?) that dates back to at least 1972, still doing fine, where nobody can see it.
Logged
Ed Kapuscinski
Global Moderator
Crew
Posts: 24744
Head Kino
Respect:
+9271
Re: Reusing track for new layouts -- pro or con?
«
Reply #4 on:
February 19, 2015, 09:23:30 AM »
0
I'm pretty sure that 50% of the layouts built in the mid-atlantic area are made up in whole or part of re-lay rail from Jerry Britton's old layout...
Logged
Visit:
Conrail1285.com
&
Railfanning.Kapuscinski.net
Join:
TheCRHS.org
Catt
Crew
Posts: 1721
Gender:
Respect:
+28
Re: Reusing track for new layouts -- pro or con?
«
Reply #5 on:
February 19, 2015, 09:33:14 AM »
0
Unless it is damaged during renovation or removal of the old layout I recycle the old track.If I am changing code (55 for 80) I will use the old track where it isn't ovious as in hidden staging.
Logged
Johnathan (Catt) Edwards
Sole owner of the
Grande Valley Railway
100% Michigan made
mmagliaro
Crew
Posts: 6368
Gender:
Respect:
+1871
Re: Reusing track for new layouts -- pro or con?
«
Reply #6 on:
February 19, 2015, 11:08:34 AM »
0
I guess I'm the outlier here. I have reused turnouts before, since they are particularly expensive, and that means I take great care to harvest them from old layouts. But for flex, I have never reused it.
I think part of this is driven by the fact that my layouts have always been medium sized (i.e. 9 x 12 room size) ,
so even with fairly expensive ME flex, the total cost is a few hundred dollars, which is not huge in
the context of all the money that goes into a layout (On the order of 5-6 engines' worth of cost).
I would say consider the true dollar amount you are saving, vs the time and requirement of getting
track up, possibly out of ballast, getting it clean so it lays flat, and being really sure you have no
odd little bend in any part of it.
Logged
davefoxx
Crew
Posts: 11675
Gender:
TRW Plaid Member
Respect:
+6801
Re: Reusing track for new layouts -- pro or con?
«
Reply #7 on:
February 19, 2015, 11:12:28 AM »
0
Since I use yellow glue to secure my track, it easily comes free with a putty knife, and I've been known to even reuse it on the same layout during realignments and expansions. I would not hesitate to harvest all of my track and recycle it on the next layout, if I scrapped my current layout. Even ballasted track comes clean with a soak in water. That would save me hundreds, if not thousands, of dollars.
DFF
EDIT: Another concern would be the availability and current pricing of new track.
«
Last Edit: February 19, 2015, 11:14:26 AM by davefoxx
»
Logged
Member: ACL/SAL Historical Society
Member: Wilmington & Western RR
A Proud HOer
BUY ALL THE TRAINS!
drgw0579
Crew
Posts: 271
Respect:
+52
Re: Reusing track for new layouts -- pro or con?
«
Reply #8 on:
February 19, 2015, 11:28:25 AM »
0
A couple months ago, our club was approached by someone who's layout was involved in a divorce and needed to get it removed immediately. There was over a 1000' of Atlas code 55 flex and probably 20-30 Atlas switches. I was needing track to complete my new staging yard, and at the time, very little new flex track could be found. So I offered to scrap out the layout.
We found out right away the track had mostly been glued down on cork roadbed with non-water soluble glue and in some places directly on plywood. Where it was ballasted, it was basically impossible to remove intact. One of my friends spent the better part of the time carefully removing the switches, and his efforts were rewarded well. I ended up using a drywall "mud knife" to peel the cork away from the plywood and carting the remains away in big boxes. Later on it took me several days to carefully cut the cork away from the bottom of the ties with an x-acto knife. But my success rate for getting usable track was not good, maybe only 50%. IMHO Atlas Code 55 track, being finer, is not as robust at Code 80 might be. I have a lot of C55 rail in case I ever want to hand lay my own track!
I was happy that I got enough track and switches out of it for an 11 track staging yard where most tracks were about 17' long. Using new track would have cost a fortune (which I then spent the savings on ESU decoders). Since the benchwork was assembled with drywall screws, that came apart quickly and filled a pickup-sized trailer twice. Hopefully a friend with a new basement and house on top can use the majority of that soon. Another friend has been heating her apartment this winter with the plywood used for the track structure.
All in all it was worth it, but I probably wouldn't do it again.
Bill Kepner
«
Last Edit: February 19, 2015, 12:24:20 PM by drgw0579
»
Logged
PAL_Houston
Crew
Posts: 823
Gender:
Respect:
+17
Re: Reusing track for new layouts -- pro or con?
«
Reply #9 on:
February 19, 2015, 08:42:16 PM »
0
My current layout is mostly new, because I was also changing from code-80 to code-55.
However, owing to Atlas' supply issues over the last couple years, I have used OTHER PEOPLE's used turnouts, and I am perfectly happy to be running trains, as opposed to not running trains.
Logged
Regards,
Paul
Kentuckian
Crew
Posts: 900
Gender:
"This all started with Romans 10:9!" -Apologetix
Respect:
+496
Re: Reusing track for new layouts -- pro or con?
«
Reply #10 on:
February 19, 2015, 10:38:08 PM »
0
This is the third layout for some of my peco code 55 switches; those things are bulletproof. I am also using used Atlas code 55 switches obtained on the secondary market. I never have reused flex track, but my layouts to date have been small enough that new flex is not very expensive.
Logged
Modeling the C&O in Kentucky.
“Nature does not know extinction; all it knows is transformation. ... Everything science has taught me-and continues to teach me-strengthens my belief in the continuity of our spiritual existence after death. Nothing disappears without a trace.” Wernher von Braun
casmmr
Crew
Posts: 209
Gender:
It is a Hobby
Respect:
+20
Re: Reusing track for new layouts -- pro or con?
«
Reply #11 on:
February 20, 2015, 07:56:17 AM »
0
With Kato unitrack, re use is easy, just clean off the old white glue and ballast and reuse after checking the joiners. I have pieces that I have used on 3 or 4 different t-trak modules.
Logged
Print
Pages: [
1
]
Go Up
« previous
next »
TheRailwire
»
General Discussion
»
N and Z Scales
»
Reusing track for new layouts -- pro or con?