I've have just about finished wiring the track from Aquia Landing to Falmouth. The Stoneman's block is the only one not done. There is just one more turnout to finish gapping and a switch stand to install. Then run the bus wire for that block and solder on the already dropped feeders.
An astute observer might say, "Wait a minute, you showed us a video in April of trains running at Stoneman's?"
Yes, but that was temporary wiring with alligator clips and spiked down turnouts. This is the real deal.
Of course, I still need to lay track in Aquia Landing. But, once this section is wired up, and I get a few more cars built,I could try a simple op session.
Here is a short video showing a test run from Aquia Landing to Stoneman's Station. Note that the train speed is probably a bit fast. The USMRR instituted a 5 MPH speed limit on the whole railroad. So when operating, the trains should move much slower.