Author Topic: The Los Pinos and Toltec Smelter  (Read 25230 times)

0 Members and 1 Guest are viewing this topic.

Peter S

  • Crew
  • *
  • Posts: 83
  • Respect: +240
Re: The Los Pinos and Toltec Smelter
« Reply #150 on: November 27, 2021, 12:00:16 AM »
+3
It has been a while, but I have not been idle. I will put several photos up of the current project, a very freelance six foot section or "room" There will be a trestle bridge here that is being slowly built but I like the way the train sways out to the camera and then flows back. All trees are hand made and all castings from my collection. The rocks are hand painted individually with an optivisor and plenty of patience. I believe they were from a Trains of Texas casting from the 1980's.

[ Guests cannot view attachments ]