Author Topic: UP/BNSF Interchange in Cheyenne begs to be modeled  (Read 1123 times)

0 Members and 2 Guests are viewing this topic.

chuck geiger

  • Crew
  • *
  • Posts: 3251
  • Gender: Male
  • Las Piedras Railroad - Destination Desert
  • Respect: +2816
UP/BNSF Interchange in Cheyenne begs to be modeled
« on: December 21, 2013, 06:11:52 PM »
0
The BNSF has a flyover (over) the UP 4-track main line in West Cheyenne, but a single lead connects the BNSF and UP through this industrial area.
This begs to be modeled. The daily paper receives news print, nothing else modern, most of the industry leads are pulled. Before the line turns
the corner to head to the BNSF yard, there is a spur (not operating) into a junk yard, recycling center.









« Last Edit: December 21, 2013, 06:20:48 PM by chuck geiger »
Chuck Geiger
provencountrypd@gmail.com



C855B

  • Crew
  • *
  • Posts: 10854
  • Respect: +2409
Re: UP/BNSF Interchange in Cheyenne begs to be modeled
« Reply #1 on: December 21, 2013, 06:35:41 PM »
0
Yes, it does. Here's a topo:



Notice that the interchange used to go to the east, down the alley between 15th and 16th Streets, and on the opposite side of the station from the UP main. You can make out the shadow of that leg of the wye in the your first satellite pic.
« Last Edit: December 21, 2013, 06:38:43 PM by C855B »
...mike

http://www.gibboncozadandwestern.com

Note: Images linked in my postings are on an HTTP server, not HTTPS. Enable "mixed content" in your browser to view.

There are over 1000 images on this server. Not changing anytime soon.