Welcome,
Guest
. Please
login
or
register
.
1 Hour
1 Day
1 Week
1 Month
Forever
Login with username, password and session length
Home
Help
Gallery
Search
Stats
Login
Register
TheRailwire
»
General Discussion
»
N and Z Scales
»
UP/BNSF Interchange in Cheyenne begs to be modeled
« previous
next »
Print
Pages: [
1
]
Go Down
Author
Topic: UP/BNSF Interchange in Cheyenne begs to be modeled (Read 1123 times)
0 Members and 2 Guests are viewing this topic.
chuck geiger
Crew
Posts: 3251
Gender:
Las Piedras Railroad - Destination Desert
Respect:
+2816
UP/BNSF Interchange in Cheyenne begs to be modeled
«
on:
December 21, 2013, 06:11:52 PM »
0
The BNSF has a flyover (over) the UP 4-track main line in West Cheyenne, but a single lead connects the BNSF and UP through this industrial area.
This begs to be modeled. The daily paper receives news print, nothing else modern, most of the industry leads are pulled. Before the line turns
the corner to head to the BNSF yard, there is a spur (not operating) into a junk yard, recycling center.
«
Last Edit: December 21, 2013, 06:20:48 PM by chuck geiger
»
Logged
Chuck Geiger
provencountrypd@gmail.com
C855B
Crew
Posts: 10854
Respect:
+2409
Re: UP/BNSF Interchange in Cheyenne begs to be modeled
«
Reply #1 on:
December 21, 2013, 06:35:41 PM »
0
Yes, it does. Here's a topo:
Notice that the interchange used to go to the
east
, down the alley between 15th and 16th Streets, and on the opposite side of the station from the UP main. You can make out the shadow of that leg of the wye in the your first satellite pic.
«
Last Edit: December 21, 2013, 06:38:43 PM by C855B
»
Logged
...mike
http://www.gibboncozadandwestern.com
Note:
Images linked in my postings are on an
HTTP
server, not HTTPS. Enable "mixed content" in
your
browser to view.
There are over 1000 images on this server. Not changing anytime soon.
Print
Pages: [
1
]
Go Up
« previous
next »
TheRailwire
»
General Discussion
»
N and Z Scales
»
UP/BNSF Interchange in Cheyenne begs to be modeled