Author Topic: Cantilevered Signal Bridge for Sante Fe and So Pac  (Read 1752 times)

0 Members and 1 Guest are viewing this topic.

TrainCat2

  • Crew
  • *
  • Posts: 1994
  • Gender: Male
  • I'm here to take a beating from RailWire members.
  • Respect: +851
    • TrainCat Model Sales
Cantilevered Signal Bridge for Sante Fe and So Pac
« on: June 28, 2009, 01:53:18 PM »
0
Hi guys,

Here is my latest HO signal bridge. A cantilevered signal bridge for Sante Fe and Southern Pacific. I actually took the measurements from the SP signal at the east end of the Tuscon Yard in Dec. Tim Masyln gave me some ATSF drawings that confirmed it is the same for them. The column is one piece with added Z-Bracing making it easy to assemble. The cantilevered structure is also one piece that bends over the column. The entire model was done in less than 45 min. Next signal coming out is the Walong.





Regards
boB Knight

I Spell boB Backwards

tom mann

  • Administrator
  • Crew
  • *****
  • Posts: 10917
  • Representing The Railwire on The Railwire
  • Respect: +1013
    • http://www.chicagoswitching.com
Re: Cantilevered Signal Bridge for Sante Fe and So Pac
« Reply #1 on: June 28, 2009, 04:04:34 PM »
0
Thanks!  Where can I order these?