0 Members and 1 Guest are viewing this topic.
I will have to make 16 new legs, but that is not a show stopper. Need to order some more Hysol and 5/16 long Tee nuts. Hysol will be here in two days, the Tee nuts will not arrive until the 17th. I have enough to redo one of the modules for now.
I'm assuming that the finished sides will not be flush with the layout edge, but recessed deeper so you can put your sitting legs under there when you need to reach and do something on the layout. Otherwise you will only be able to sit near the layout with your knees bumping at the layout's sides.
I see what you mean boB, but I still think that this might not be enough to comfortable sit next to the layout's edge. To me the lower part of the layout should be inset more like 12" to be comfortable.
Good point, but then the frames & supports would be in the way of all of those switch machines that need to be installed. Having the frame at the edge and careful planning to place turnouts more than 4in from the frame will ensure there will be no clearance issues. Givens and Druthers in full play.
Not 100% sure yet John. I bought 5 servos for eval and I have about 15 Tortoise from my dismantled 1992 layout destroyed by Andrew. Going to be testing the servos out as soon as I find the right Arduino for them.
That's funny, I bought the ELEGOO Mega R3 design kit back in Dec 2021 to make the Fowler Flaps on the Connie. Put the kit aside once I got my iX20 radio which allowed me to individually program the six servos. Result was complete flaps like the Connie. How many servos are you planning to run off one of the 2560's ??Not trains, but very cool to watch the first test: https://www.youtube.com/watch?v=Glavtrq0BF0