Author Topic: Repowering NJI Brass Washboard MU's  (Read 982 times)

0 Members and 1 Guest are viewing this topic.

Hiroe

  • Crew
  • *
  • Posts: 591
  • Respect: +256
Repowering NJI Brass Washboard MU's
« on: July 07, 2021, 08:16:16 PM »
+5
I recently snagged a 3-car set of hard-to-find NJ International brass New Haven "Washboard" MU cars off ebay. (HO scale.) They're really nice models, but the stock drives don't run worth a damn. As I've got a small hoard of Walthers 'metroliner' MU drives on hand for just such a reason, I set about repowering the NJI brass cars with them. Originally the 3-car set had one powered "motor" coach and two trailing "motor" coaches; but I went ahead and powered all three coaches. (I also picked up a 4th "Club" car from a friend, in trade for repowering one of his to be layout-ready to run with mine. I did not power the "Club" car.)

[ Guests cannot view attachments ]


The stock drive. It sounds like a blender, does not have the ability to pull unpowered cars, and ended up breaking both spring belts in under an hour.

[ Guests cannot view attachments ]


The powered car with the stock drive removed, in preparation for fitting the new drive.

[ Guests cannot view attachments ]


The trailing trucks also got extra wheel wipers, to give each powered car all-wheel pickup.

[ Guests cannot view attachments ]


The floor after cutting to clear the new drive truck swing.

[ Guests cannot view attachments ]


Fitting the repurposed Walthers drive truck required fabrication of a new bolster. A short length of brass bar stock with an 0-80 roundhead screw for the kingpin pivot works wonderfully.

[ Guests cannot view attachments ]


About ready to start hooking up the decoder and assemble the car.

[ Guests cannot view attachments ]


With the body set on the floor/drive, testing it on the layout. Note that the motor/flywheels are still unpainted here, so you can clearly make them out through the windows.

[ Guests cannot view attachments ]
« Last Edit: July 07, 2021, 08:38:57 PM by Hiroe »
wubba lubba dub dub

Hiroe

  • Crew
  • *
  • Posts: 591
  • Respect: +256
Re: Repowering NJI Brass Washboard MU's
« Reply #1 on: July 07, 2021, 08:38:03 PM »
+3
And then there were two.


[ Guests cannot view attachments ]

[ Guests cannot view attachments ]

I ended up reusing the truck sideframes from the removed stock trucks, soldered onto hand-fabricated brass tabs that fit into the sideframe mounts on the walthers metro truck. A drop or two of gap-filling acc to keep it angled properly in the mount, and you'd have to look really closely to notice the difference.

They now run like champs, though; and I'm going to enjoy operating a proper train of these at shows.

[ Guests cannot view attachments ]

[ Guests cannot view attachments ]
wubba lubba dub dub

Bottomdrain

  • Guest
Re: Repowering NJI Brass Washboard MU's
« Reply #2 on: July 13, 2021, 12:12:24 PM »
+1
Now, that's the kinda stuff I like! Very well documented!

Bobby

Hawghead

  • Crew
  • *
  • Posts: 791
  • Gender: Male
  • Respect: +325
Re: Repowering NJI Brass Washboard MU's
« Reply #3 on: July 17, 2021, 01:47:20 PM »
0
What?  No video?  Nicely done, kudos.

Scott
There's a prototype for everything.
If you can't make it perfect, make it adjustable.
DCC is not plug-n-play.

bbussey

  • Crew
  • *
  • Posts: 8890
  • Gender: Male
  • Respect: +4715
    • www.bbussey.net
Re: Repowering NJI Brass Washboard MU's
« Reply #4 on: July 17, 2021, 06:04:42 PM »
+1
The N scale versions aren't any better.  @u18b Ron Bearden re-powered, digitized and illuminated my set.
Bryan Busséy
NHRHTA #2246
NSE #1117
www.bbussey.net


Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 24745
  • Head Kino
  • Respect: +9272
    • Conrail 1285
Re: Repowering NJI Brass Washboard MU's
« Reply #5 on: July 28, 2021, 03:31:45 PM »
0
Off topic, but this is The Railwire... those tracks need grease stains down the middle of them.