0 Members and 1 Guest are viewing this topic.
I discovered the end points for guard rail are actually recycled frog points for turnouts! Anyone knows who makes them (the points only, not the entire frog). I've already looked up the FastTracks website and found nothing.
Here ya go...I use gap filling CA to glue mine down, and I don't follow the prototype drawing spec of having the guardrail ends ground and bolted together at the ends. Also, the spec's on other drawing I have call for recycled frog points to be used on the guardrail ends.However, actual observation over the years makes it pretty evident that the "standards" for guardrail ends, and the way the ends are bent up differs considerably on the prototype, many times with one style of guardrail on one bridge and another style on the second bridge on a double-tracked mainline, and on double mainlines that are always traveled one way on one main and the opposite way on the other main, sometimes the guardrail end along with any bending of the guardrails was totally left off of the end of the bridge where the train would exit.Here's a drawing that shows how the rounded ends of the guardrails is done, which I think is a nifty way of doing it...Cheerio!Bob Gilmore