0 Members and 1 Guest are viewing this topic.
The Railwire is not your personal army.
Paywall, but I got to it through a VPN proxy.I am concerned about safety in handling a manifest train of this length. Unlike "closed system" trains like coal, oil and to a degree, COFC, the mix-and-match of various car types, weights, lengths and conditions are a witches brew. All it will take is one dynamiter on the wrong side of the node and you have "stuff" everywhere.
N&W routinely ran 200 car trains ...In 1967, N&W ran a 500 car loaded coal train - 21,424 feet long!Forget about doing that in N! (N&W used 6 SD45s).Mark
Mark W: If I remember right, they had the locos spaced through the train, for just that reason. It lessened the coupler stress enough to prevent pulled drawbars and broken knuckles.
As far as N scale goes, we used to run trains that long back in my N trak days...
.......complete with repeated break-aways and derailments and running over into at least three other members' running time for the line...........................
Of course, way back when, CGW would create 200 car trains.