Author Topic: Conrail - Boston Line  (Read 31921 times)

0 Members and 1 Guest are viewing this topic.

Ian MacMillan

  • Global Moderator
  • Crew
  • *
  • Posts: 12034
  • Gender: Male
  • Learn to use the god damn search feature!
  • Respect: +166
    • Conrail's Amoskeag Northern Division
Re: An extra day off leads to bad things
« Reply #45 on: December 26, 2010, 04:13:47 PM »
0
WOW....all I can say is WOW Dave, that...is... AWESOME!!!
I WANNA SEE THE BOAT MOVIE!

Yes... I'm in N... Also HO and 1:1

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7026
Re: An extra day off leads to bad things
« Reply #46 on: December 26, 2010, 04:21:18 PM »
0
Glad you like it. It was fun to render. It still needs some tweaking--there are logic flaws in the IT area, but they're minor--just needs a runaround here and there to make up for the fact that things are flipped around and folded back on themselves.

MEC_FAN

  • Crew
  • *
  • Posts: 421
  • Respect: 0
Re: An extra day off leads to bad things
« Reply #47 on: December 26, 2010, 04:37:49 PM »
0
Ian, I really digging Davids plan!!!! I don't suppose theres anyway to cheat and put in the PVRR interchange in there, its such a cool little RR!! I want to build a CF-7.
MEC_FAN

I love the smell of pulpwood in the morning!!

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7026
Re: An extra day off leads to bad things
« Reply #48 on: December 26, 2010, 06:27:11 PM »
0
The previous rendering was almost literally a sketch. I've taken that sketch and run it through AnyRail to verify the track geometry. Very little needed to be adjusted; absolute minimum radius is 11 inches. I also added a couple of runarounds to make life easier in the IT district owing to all of the cutting and pasting.

This AnyRail export shows all of the track sections. A color-coded switch list is included; total trackage is ~390 feet, excluding the staging yard. I deliberately avoided using any curved turnouts owing to Dave Foxx's reported problems; there are a couple of places where they'd improve the track geometry somewhat, but it's not critical by any means.



Larger: http://whiteriverandnorthern.net/images/ian5p.gif
« Last Edit: December 26, 2010, 06:53:26 PM by David K. Smith »

Ian MacMillan

  • Global Moderator
  • Crew
  • *
  • Posts: 12034
  • Gender: Male
  • Learn to use the god damn search feature!
  • Respect: +166
    • Conrail's Amoskeag Northern Division
Re: An extra day off leads to bad things
« Reply #49 on: December 26, 2010, 08:14:41 PM »
0
Dave, once again that looks great! Of course it only needs 5 #10's as I now have a bunch of them pulled up to be used second hand! Thanks again so much, this is going to be fun to build.


Ian, I really digging Davids plan!!!! I don't suppose theres anyway to cheat and put in the PVRR interchange in there, its such a cool little RR!! I want to build a CF-7.

I know really, it is a very nice plan and it offers lots of switching and mainline action hotness. I'd love to add the Pioneer Valley, but there is just no way. Having it on the layout sans West Springfield yard I believe would be really odd in terms of flow.
I WANNA SEE THE BOAT MOVIE!

Yes... I'm in N... Also HO and 1:1

John

  • Administrator
  • Crew
  • *****
  • Posts: 13396
  • Respect: +3257
Re: An extra day off leads to bad things
« Reply #50 on: December 26, 2010, 08:35:14 PM »
0
why not replace the 7s with 10s if you have them .. at least on the mainline

Ian MacMillan

  • Global Moderator
  • Crew
  • *
  • Posts: 12034
  • Gender: Male
  • Learn to use the god damn search feature!
  • Respect: +166
    • Conrail's Amoskeag Northern Division
Re: An extra day off leads to bad things
« Reply #51 on: December 26, 2010, 08:36:59 PM »
0
why not replace the 7s with 10s if you have them .. at least on the mainline

All the mains are #7's except for the Amtrak tracks and the wye which is ok. I may see how the IT works with #7's as I have MANY of those already as well.
I WANNA SEE THE BOAT MOVIE!

Yes... I'm in N... Also HO and 1:1

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7026
Re: An extra day off leads to bad things
« Reply #52 on: December 26, 2010, 08:49:58 PM »
0
Ian, if you post an inventory of the switches you've got, I can rework the plan to suit. Much of the IT area will work with either 5s or 7s.
« Last Edit: December 26, 2010, 08:53:20 PM by David K. Smith »

James Costello

  • Crew
  • *
  • Posts: 1833
  • Respect: +337
Re: An extra day off leads to bad things
« Reply #53 on: December 26, 2010, 08:56:38 PM »
0
Someone get DKS a beer!  Awesome rendering...

Would have thought it was worth at least a case of beer  ;D
(or a carton for the Aussies here)

Wow, amazing work DKS.
James Costello
Espee into the 90's

Ian MacMillan

  • Global Moderator
  • Crew
  • *
  • Posts: 12034
  • Gender: Male
  • Learn to use the god damn search feature!
  • Respect: +166
    • Conrail's Amoskeag Northern Division
Re: An extra day off leads to bad things
« Reply #54 on: December 26, 2010, 09:32:33 PM »
0
Ian, if you post an inventory of the switches you've got, I can rework the plan to suit. Much of the IT area will work with either 5s or 7s.

This is what I was able to salvage without damage.

7L -16
7R - 11


If it drasticly changes it I dont mind sticking with #5's as I am sure the #7's could find a good home.
I WANNA SEE THE BOAT MOVIE!

Yes... I'm in N... Also HO and 1:1

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7026
Re: An extra day off leads to bad things
« Reply #55 on: December 26, 2010, 09:36:41 PM »
0
This is what I was able to salvage without damage.

7L -16
7R - 11


If it drasticly changes it I dont mind sticking with #5's as I am sure the #7's could find a good home.

It won't make any drastic changes. Should have the revision up shortly.

DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7026
Re: An extra day off leads to bad things
« Reply #56 on: December 26, 2010, 10:11:12 PM »
0
Revised plan. Uses the exact number of #7s you have (shown in red). I also tweaked the IT area just a bit more after studying the maps again.
 


http://whiteriverandnorthern.net/images/ian6p.gif
« Last Edit: December 27, 2010, 09:15:27 AM by David K. Smith »

bbussey

  • Crew
  • *
  • Posts: 8894
  • Gender: Male
  • Respect: +4716
    • www.bbussey.net
Re: An extra day off leads to bad things
« Reply #57 on: December 26, 2010, 10:18:03 PM »
0
David,

Can AnyRail automatically create a track plan from a scale sketch?  Or are you so familiar with the product that you can create plans easily?
Bryan Busséy
NHRHTA #2246
NSE #1117
www.bbussey.net


DKS

  • The Pitt
  • Crew
  • *
  • Posts: 13424
  • Respect: +7026
Re: An extra day off leads to bad things
« Reply #58 on: December 26, 2010, 10:46:08 PM »
0
David,

Can AnyRail automatically create a track plan from a scale sketch?  Or are you so familiar with the product that you can create plans easily?


No, AnyRail isn't able to convert an image or scan into a plan; it can, however, import an image over which one can trace a plan. I also know the application well enough that I can generate plans quickly.

John

  • Administrator
  • Crew
  • *****
  • Posts: 13396
  • Respect: +3257
Re: An extra day off leads to bad things
« Reply #59 on: December 27, 2010, 07:54:19 AM »
0
Ian - whats the ops concept .. I don't see a yard here .. will all the locals come out of staging, and everything else just be a run through?