Howdy all,,, Since I now have a 3rd shift job and 4 days off during the week, I have time to work on the trains some.
I am thinking about a garage sized two level layout. Recently I have gotten some wonderful Atlas cd 55 products, along with my hand laid turnouts I am on my way to having my empire.
The first two pictures show the #6 hand laid turnouts using the fast tracks fixture. One is un-painted, ( no kidding) and the second is painted with a Krylon spray bomb. Under their camoflauge paint line,, Brown 8142.
Here are two side by side along with Atlas track, already painted brown
Here are some overall shots. These are buildings that I currently use on the old layout in the same area.
1. I might replace the elevator with a LPG dealer/plant
2. The mill in the rear might give way to a warehouse/ manufacturing plant building flat.
3. The tank farm is sitting in area that could be used to expand Badger Paper Company with tall buildings and whole bunch of tanks, piping and stuff.
As you can tell I like switching. I am thinking about placing two more locations of switching like this on the new WBTR/SOO
Here is a plan that freind of mine came up with for the lower level,,, this plan is subject to change. As is everything in life.LOL
Any input will be considered and maybe even used,,,,lol
Adios Wyatt