0 Members and 1 Guest are viewing this topic.
Interesting, John. How many signals do you think you'll have on the layout?
I have no choice but to try to make them myself .. it would be too costly to go with some of the great commercial products ..
Quote from: John on February 25, 2007, 07:34:45 PMInteresting, John. How many signals do you think you'll have on the layout?I am going to need 3 signals for each end of the sidings .. 30 or so signals there ..2 signal bridges per crossover .. about 14 ..and a bunch of intermediate signals .. 20-25 .. I have no choice but to try to make them myself .. it would be too costly to go with some of the great commercial products ..
John, I rigged a similar drawbar, only I used a slightly longer Rapido shank (I have about a million of them in a box, so I have no idea where it came from...)What I did was cut off the "box" from the Rapido, leaving a double-ended T shank of an appropriate length. This allowed both sides to flex equally, and I had no problems through S curves at turnouts. My rig was between a pair of FA's, which are 4 axle, so the dynamics may have been a bit different.Lee