This afternoon I laid out the entire 15 foot east end of the layout. Learned a few more things about assembling splines. The more I work with these things the more I like it. These photos show how I used the soft strips to mockup the track layout. Some adjustment is necessary, but what you see here is pretty much what will be assembled tomorrow. Not much commentary this time, just pictures with captions...
Area under construction
Harrowgate looking west. Tracks 1 and 2, eastbound, are to the left.
Tracks 3 and 4, westbound, to the right. Track 4 is beginning its rise to the flyover at EF.
BQ tower will sit about where the orange clamps are now.
Looking west toward BQ. Track 3 westbound is merging with eastbound tracks from right.
Track 4 snakes over the passenger mains (Tracks 2 and 3) which split off to the right at BQ
Track level view from BQ. Track 1, the eastbound freight main, comes straight out of East Keystone and DI tower.
Tracks 2 and 3, the east and west bound passenger mains curve right and under Track 4, the westbound freight main, at EF tower.
Aerial view of same area
Aerial view, looking west, of the west side of the flyover at EF tower.
DI tower looking east towards BQ. Track 4 approaches from the left.
Looking west towards Llyswen Yards Tracks 1 and 4, the freight mains, head into East Keystone at left.
Tracks 2 and 3, passenger mains, curve right to bypass the yards.
Overall view of "eastern" side of the layout.
Mockup of curved stone arch bridge over Juniata just east of BQ.
Mockup of straight stone arch bridge just west of Short Mountain Tunnel
Eastbound spline will be modified to match Atlas bridge sides.
The flyover will be handled in a similar manner as the bridges.
Radius Gage made from plywood center portion of a helix level.
Radius of cut is 16.5 inches. Radius of track curve 18.5.
Delaminator! A fishing knife in previous existence, Delaminator now serves by splitting strips from spline.
Here it is removing hard strip.
Delaminator once again, this time splitting a two track spline into a pair of single tracks.
I screwed up and double tracked the entire eastbound spline between East Keystone and Harrowgate. It was easy enough to change though, as you can see from the photos.