XIH BOXCAR UPDATE — FIVE WEEK SHIP DELAY
« on: October 10, 2022, 01:34:11 PM »
+3
Everyone,

Unfortunately we discovered a production error the day before the shipment was scheduled to leave the factory. The roofwalk artwork was inadvertently mirrored before etching and the half-etched roof support plates are even with the top of the roofwalk (instead of on the bottom face so that the roofwalk grating would be present above it.

It will take five weeks to etch corrected roofwalks, assemble and paint new roofs, and replace the current roof assemblies. Fortunately the model is very modular and the roofs snap in place. The error becomes apparent only when looking from above under strong light, so a lot of people missed the error until the shipment was being prepped for pickup. Fortunately it was caught at the point where it costs us only a month, so we are now looking at a mid December delivery which should have the cars in modelers hands by Christmas.

We realize the additional delay is disappointing, but late and correct is better than on-time and wrong. Ironically, we had a similar scenario with the N scale XIH regarding some of the body details which caused an initial release delay.
« Last Edit: October 10, 2022, 05:39:01 PM by bbussey »
Bryan Busséy
NHRHTA #2246
NSE #1117
www.bbussey.net


jargonlet

  • Crew
  • *
  • Posts: 280
  • Respect: +142
Re: XIH BOXCAR UPDATE — FIVE WEEK SHIP DELAY
« Reply #1 on: October 10, 2022, 11:24:57 PM »
0
I hate to hear that but it is for the best that they caught it before shipment. I could imagine the headaches it would add if it had left the factory like that. I’d hate to see the ho community look poorly at your rolling stock based on that error.

bigdawgks

  • Crew
  • *
  • Posts: 216
  • Respect: +188
Re: XIH BOXCAR UPDATE — FIVE WEEK SHIP DELAY
« Reply #2 on: October 10, 2022, 11:46:30 PM »
0
Does this mean the arrival of the new N scale wheelsets is also postponed?

nkalanaga

  • Crew
  • *
  • Posts: 9898
  • Respect: +1446
Re: XIH BOXCAR UPDATE — FIVE WEEK SHIP DELAY
« Reply #3 on: October 11, 2022, 01:45:03 AM »
0
Mistakes happen, and compliments to the person in Quality who caught it!
N Kalanaga
Be well

bbussey

  • Crew
  • *
  • Posts: 8895
  • Gender: Male
  • Respect: +4716
    • www.bbussey.net
Re: XIH BOXCAR UPDATE — FIVE WEEK SHIP DELAY
« Reply #4 on: October 11, 2022, 07:56:29 AM »
0
Does this mean the arrival of the new N scale wheelsets is also postponed?

Yes it does, as they are part of the same shipment.
Bryan Busséy
NHRHTA #2246
NSE #1117
www.bbussey.net


bbussey

  • Crew
  • *
  • Posts: 8895
  • Gender: Male
  • Respect: +4716
    • www.bbussey.net
Re: XIH BOXCAR UPDATE — FIVE WEEK SHIP DELAY
« Reply #5 on: October 25, 2022, 06:03:35 PM »
+3
The roofwalk tooling has been corrected and production has resumed.  We estimate a mid-December rollout to dealers/consumers.




Bryan Busséy
NHRHTA #2246
NSE #1117
www.bbussey.net


djconway

  • Crew
  • *
  • Posts: 482
  • Respect: +74
Re: XIH BOXCAR UPDATE — FIVE WEEK SHIP DELAY
« Reply #6 on: October 25, 2022, 10:41:40 PM »
+1
Bryan,

Thank you for posting updates on production issues.  Often times it seems manufacturers announce something then we don't hear a word until it shows up in the shops.

nkalanaga

  • Crew
  • *
  • Posts: 9898
  • Respect: +1446
Re: XIH BOXCAR UPDATE — FIVE WEEK SHIP DELAY
« Reply #7 on: October 26, 2022, 02:09:11 AM »
0
Or, in some cases, is never heard of again!