Critique My Trackplan
« on: April 06, 2018, 02:14:15 PM »
0
Hey everyone, so after a long time I finally came up with a trackplan.  The plan takes the top of DKS's Jersey City Industrial and the bottom of the Central Maine RR trackplan and combines them to fit in a 3x5 ft space.

The plan uses Unitrack, and has a minimum radius of about 12". I thought about using Kato #4s in some areas, however I settled on using #6s instead. 

The bottom track that leads of the layout will probably go to staging or serve a small customer. I'm not exactly sure about what buildings the layout would use but the ones I have one the plan should give a general idea of what I'd like to achieve. The layout hopes the capture the "urban canyon" feel with the signature scene being the the branch that parallels the road and the switchback that crosses the street. The scene takes a lot of inspiration from Southern's branch in Lynchburg https://www.flickr.com/photos/retroweb/11279779524

The layout's setting is a freelanced version of the Southern K&O line through Knoxville.  Traffic may have transfer runs, freights, coal trains, and maybe some passenger ops.

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 24748
  • Head Kino
  • Respect: +9273
    • Conrail 1285
Re: Critique My Trackplan
« Reply #1 on: April 06, 2018, 02:18:25 PM »
0
Walk us through some ops.

High Hood

  • Crew
  • *
  • Posts: 507
  • Respect: +129
Re: Critique My Trackplan
« Reply #2 on: April 06, 2018, 06:09:37 PM »
0
The layout's main train would be the local that switched everything.  It would enter the layout from the bottom right and make a few laps around before arriving at the runaround.  From there it would work the first two industries.  After working them it would prepare to work the top half of the layout.  Some cars would have to be shoved due to the lack of a runaround, while the rest would be pulled. I'm not sure if the tail track of the switchback will serve anything or not yet, but if so cars would have to be pulled before crossing the street then it would place inbound cars on the tail track.  After switching the top half it the local would have to run caboose first to the runaround, then prepare the train to head back to Sevier Yard.  After that it would make a few more laps before arriving at Sevier.

There are a few ways to mix things up with the local.  Instead of basing it out of Sevier Yard, it could work out of City Yard or maybe Coster and back out of staging and have to work the opposite way it would out of Sevier.  Having to clear the main and work around superior trains would be another way.

Transfer and interchange runs would run between the yards and may make a pick up or setout.

The K&O also had multiple freights a day, as well as coal trains from Jellicho to Sevier or maybe some from Middlesboro heading West instead of to Sevier.  Passenger trains also ran too, so I have an excuse to run passenger trains despite to smaller radius.  So the there is a lot of potential for roundy round running.

Since the layout would primarily be set in 1957, so I can run FT's.  Because of Knoxville's location on the Southern all kinds of motive power could be seen.  Fairbanks Morse came in off the CNO&TP, ALCO's could come up from Georgia or the Carolina's, and EMD was all over the place.
« Last Edit: April 06, 2018, 06:13:04 PM by High Hood »