This layout is being Planned for 2020/21 start as its a rather large undertaking and will require me to do more finishing work in my basement and invest a good bit of $$$
Plan is to model 50 Miles of the Middle division between Denholm and Huntingdon circa 1954. The current design gives me about 266' of mainline run so about 8 Scale miles.
2 Large staging yards will be constructed on either end to hold all the trains. I`m still working on a full list of trains, but I`m going to run all of the scheduled 1954 Passenger trains along with the freights, but I`ll have to come up with a list of extras to fill the holes as most the freights where extras.
Lower level Denholm to Lewistown

Nolix and upper level Lewistown to Huntingdon

The following Interlockings will be modeled:
Wall Denholm
Lewis-Lewistown
Jacks-Mt Union
Hunt-Huntingdon
Deer-Huntingdon