Welcome,
Guest
. Please
login
or
register
.
1 Hour
1 Day
1 Week
1 Month
Forever
Login with username, password and session length
Home
Help
Gallery
Search
Stats
Login
Register
TheRailwire
»
General Discussion
»
N and Z Scales
»
Brainstorming: 2-4-4-2 log hogger.
« previous
next »
Print
Pages: [
1
]
Go Down
Author
Topic: Brainstorming: 2-4-4-2 log hogger. (Read 1757 times)
0 Members and 1 Guest are viewing this topic.
Teakettle tuner
Posts: 4
Respect:
0
Brainstorming: 2-4-4-2 log hogger.
«
on:
November 26, 2013, 09:01:53 AM »
0
I have been thinking of trying to build a 2-4-4-2 logging engine. Not too sure that I am capable. I would appreciate any thoughts and ideas from you talented folks here on the wire. Thanks.
Logged
Philip H
Crew
Posts: 8910
Gender:
Respect:
+1655
Re: Brainstorming: 2-4-4-2 log hogger.
«
Reply #1 on:
November 26, 2013, 09:03:52 AM »
0
Are you looking to do an articulated, Mallet type like Rayonier had out west?
Logged
Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.
Teakettle tuner
Posts: 4
Respect:
0
Re: Brainstorming: 2-4-4-2 log hogger.
«
Reply #2 on:
November 26, 2013, 09:07:59 AM »
0
Ya. Something maybe half way resembling the Deep river NO. 7 ............
Logged
Philip H
Crew
Posts: 8910
Gender:
Respect:
+1655
Re: Brainstorming: 2-4-4-2 log hogger.
«
Reply #3 on:
November 26, 2013, 09:18:47 AM »
0
so there's stuff like this online that could be a parts source (though not a mechanism)
http://www.amazon.com/Mallet-Class-96-diecast-locomotive/dp/8325214724
These guys have an interesting build article for a British prototype:
http://www.009.cd2.com/river_brue.htm
and Bachman, Lifelike and Rowa have all sold larger Mallet/articulated steamers you could start with.
Logged
Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.
superturbine
Crew
Posts: 909
Gender:
Respect:
+62
Re: Brainstorming: 2-4-4-2 log hogger.
«
Reply #4 on:
November 26, 2013, 11:52:57 AM »
0
Two Bachmann consolidations reduced to two drivers per mechanism. Front engine attached by universal couplings from the rear engine worm. Both drivers per mech are gear driven. Main rods and eccentric rods would need to be shortened and valve gear moved backwards. That's a thought off of the top of my head and without looking at the mech.
Logged
delamaize
Crew
Posts: 2400
Gender:
Prairie Line Native
Respect:
+547
Re: Brainstorming: 2-4-4-2 log hogger.
«
Reply #5 on:
November 26, 2013, 12:07:53 PM »
0
Ive been kicking this idea around for a long time....the appealing thing about the whole thing is the fact that then engines are short enough to potentially allow proper articulation rather than what we are accustom to. Although none of my ideas have worked put yet.
Logged
Mike
Northern Pacific, Tacoma Division, 4th subdivision "The Prarie Line" (still in planning stages)
wazzou
Crew
Posts: 6728
#GoCougs
Respect:
+1656
Re: Brainstorming: 2-4-4-2 log hogger.
«
Reply #6 on:
November 26, 2013, 12:23:15 PM »
0
I'd much prefer a 2-6-6-2 of small driver diameter. Anyone have one of those nifty Micro-Ace 0-6-6-0's they're hoarding?
Logged
Bryan
Member of NPRHA,
Modeling Committee Member
http://www.nprha.org/
Member of MRHA
Teakettle tuner
Posts: 4
Respect:
0
Re: Brainstorming: 2-4-4-2 log hogger.
«
Reply #7 on:
November 26, 2013, 05:14:06 PM »
0
I do have a pair of Micro-Ace 0-6-6-0s , they are both 51s. They run so sweet that I just can't bring myself to butcher one up. A Minitrix 0-4-4-0 would probably be a good starting place, but they are a bit pricey when you can find one.
Logged
SkipGear
Crew
Posts: 2418
Gender:
Respect:
+629
Re: Brainstorming: 2-4-4-2 log hogger.
«
Reply #8 on:
November 27, 2013, 10:22:28 AM »
0
The Trix would be the place to start -
http://www.walthers.com/exec/productinfo/739-12404
Valve gear need to be so compact that I don't know of anything else that would make a good starting point.
Logged
Tony Hines
Print
Pages: [
1
]
Go Up
« previous
next »
TheRailwire
»
General Discussion
»
N and Z Scales
»
Brainstorming: 2-4-4-2 log hogger.