0 Members and 1 Guest are viewing this topic.
I have a need myself for 2-3 Industrial Overhead Cranes so DO expect those to be rerun early 2025. Have you guys seen the prices being paid for the Walthers plastic crane? I have been watching them for years going for over $125 for a part that used to MSRP for less than $20. THAT requires investigation for a new product. May have to sub-contract a 3D printer to get the winches. I’m hesitant cuz any self respecting scratchbuilder can make those. Thoughts?SP Late signal bridge. This has come up before in PMs and while I can etch parts, I do not have a laser cutter. Even the small desktop models can’t be justified for the few parts so These will need subcontractors as well. I would need 20-25 hard reservations for this item. Same for the SP Early.Wood chip loader is a huge metal hog meaning it could be $200 plus and also needs laser cutting.I no longer have a personal need, but I have a design that I was at 80% complete and would love to see that come to light. Would anyone have a need for a Skewed Thru Pratt Bridge? I was creating the bridge design after seeing it on the Southern Rat Hole line. It could be a cool structure. Main reason I never produced it was I saw people kitbashing CV bridges.Always on the lookout for ideas that can be viable.
Always on the lookout for ideas that can be viable.
I have a need myself for 2-3 Industrial Overhead Cranes so DO expect those to be rerun early 2025. Have you guys seen the prices being paid for the Walthers plastic crane? I have been watching them for years going for over $125 for a part that used to MSRP for less than $20. THAT requires investigation for a new product. May have to sub-contract a 3D printer to get the winches. I’m hesitant cuz any self respecting scratchbuilder can make those. Thoughts?
I no longer have a personal need, but I have a design that I was at 80% complete and would love to see that come to light. Would anyone have a need for a Skewed Thru Pratt Bridge? I was creating the bridge design after seeing it on the Southern Rat Hole line. It could be a cool structure. Main reason I never produced it was I saw people kitbashing CV bridges.
Just finished converting the Industrial Overhead Crane Support to the smaller sheets. Waiting on actual pricing, but a crane support kit should be $80. Need a commitment of 10 to proceed.
Bob,A long time ago, (I think) you announced a Seaboard Coast Line M5 caboose.Is that still possible?
FWIW, I'm about 75% done designing a 3D printed M5. The holdup has been the end ladders and railings, which need to be etched. Maybe a combined effort would cut down on cost and Bob's workload and get the project done.