Richard Newmiller MMR, PRR Dresher Division
Construction started 8/2016, and the layout was completed in 7 years.
This free-lanced prototype HO scale layout set in the mid-1960s is a walk-in design occupying a 14 ft. x 20 ft. area with 490’ of track. The dual track mainline leaves Greenwich yard, climbs a 2.25% grade into the mountains and interchanges with the saw mill and logging businesses. Operations are enhanced with 3 staging tracks, team tracks, passing sidings, multiple crossovers and 28 switching sidings that serve 30 customers. The NCE-DCC layout has multiple scratch built, exceptional quality structures, 3 of which earned the Best-in-Show award in judged NMRA contests. Scenery is complete, all motive power is sound equipped.
Mainline Eastbound:
/>
Mainline Westbound:
/>
Caboose View Mainline:
/>
Logging Westbound:
/>
Flyover:
/>
Slide Show:
/>