0 Members and 1 Guest are viewing this topic.
Finished up some mine tunnels this week in the mining section of the layout.Still have 2 more tunnels to do and add more lighting. Thanks
Peteski, here is the CTA Kedzie Avenue Bus Garage that you did the decals for since these certainly weren't available off the shelf. The building started life as a Walthers HO White Tower restaurant.
Yes I do. It is located here. https://www.therailwire.net/forum/index.php?topic=57220.0The mine is made from foam board,in fact the whole layout is from foam board, except for the bench work. I just marked out where I thought I wanted tunnels to be and cut the board in those areas. The walls are plaster of paris, I molded the walls using the old school tin foil method of casting rocks. The timber supports are just bamboo skewers stained with some dark stain I had laying around. The lighting is 3mm flickering LED's, looks like candle light or just poor electrical generation in the mine. It is turning out better than I was thinking it would. It's not super complicated but is pretty time consuming with the rocks and the timbers and the lighting. I also made mine cart tracks from some florist wire and some some home made ties. Thanks for checking it out!
Modutrak participated in the Mad City Model RR show in Madison Wi., this past weekend. Here are some shots from there. The layout won Best of Show for 2024.
Heil manufacturing, Milwaukee Wi.
Being sloppy is the least of your worries. Larger drill presses (like yours) usually use Jacobs taper mount for chucks. They are *NOT* designed to handle lateral loads of milling. I recommend reading https://www.therailwire.net/forum/index.php?topic=54357.msg745633#msg745633 and the subsequent posts from multiple members (not just me). Be careful, and good luck!