0 Members and 1 Guest are viewing this topic.
Looking for more MG Tower module updates as well, I hear you're involved in that project??? I went with the double crossover in the center for some ease at relatively higher speeds (those are the express mains anyway!!!) and I was able to give more of a straightaway (124 mm vs 62mm) between my #4 singles crossovers and the #6 double to minimize the s-curve effect.
I'm glad you've been enjoying my MG build. The reality of it is that there's a lumber shortage so I can't get the final experimental module end cap to make a loop to JFRT. I also need to figure out a table situation in the basement that fits all 4 of the modules.
I mean, if you just want to JFRT. Single modules made from MDF strips can be made from $4 in material and given you just rip apart a Sheet into 70mm strips in bulk you can put together 4 corner modules in an evening.