0 Members and 2 Guests are viewing this topic.
Glad to see you back Mike!Have been wondering what became of you?The new layout looks like a good design and great start.
Here are my thoughts:1) You didn't specify the longest car or locomotive you plan on using, but the curves look like they are about 18 inch radius. I would try to make them much larger, especially where there is 90 degrees or more of curvature.2) Who is going to perform the switching at the industries? If the traffic is generally in the direction of your description, I see several facing point turnouts. You may need to provide a way for runaround moves unless there is a local switcher.3) It might be fun for someone to take the DREI traffic from the interchange, but the track needs to head towards some staging, or at least be long enough for a train to go out of view.4) After the turnback loop but before the second grain elevator, there are some sidings there. If there is a lot of switching there, someone will be continuously standing in the narrow section of the aisle.
Hey, a blast from the past! Welcome back to the fold. Looking forward to seeing you get back to those muted fall colours. That's a huge space you have to work with. Make the most of it, but maybe think about how to approach it in stages.
Hey, a blast from the past! Welcome back to the fold. Looking forward to seeing you get back to those muted fall colours.