0 Members and 2 Guests are viewing this topic.
I go into the basement and putter. Eventually progress gets made.
^ This. Making a list and setting goals makes it too much like work for me. I just attack whatever I'm in the mood to accomplish. Granted, I'm not the fastest layout builder. Almost five years and counting on my current layout, and it's not finished, although, technically, all benchwork, trackwork, and wiring are 100% complete. It's really just scenery, structures, and finish details, such as fascia, left to do.DFF
THE HEMET DEPOT is a weird duck. It was first built as a freight station in the late 1800's, then a passenger station, burned, rebuilt, abandoned and now a museum. I had this idea of trying to find a kit to represent it. The Model Power Erie Station looked like it would fit the bill. However, Dave Foxx, who has scratched a similar station in two scales on his layout ordered it to be scratch built. (Not really "ordered" but highly suggested). In my years of communicating with him on RAILWIRE he has always been right as rain.I searched to find someone who has built Hemet in any scale. There is a different representation of it on the HO San Jacinto Model Railroad Club that doesn't look like it. Let's face it, it's weird. It has a European look that makes it look like it's right out of The Netherlands.I have decided to built from styrene. Please pray for me. I asked the depot museum for any plans and have not heard from them yet.ATSF/BNSF SAN JACINTO FACEBOOK PAGE May 02, 2022
Better idea - I was thinking making decals or printing them as paper strips. We are talking these right?
Sorry I meant your idea - BETTER IDEA, looked like I was gonna be stupid again.