Progress has been a winding road this past week. Need to wire the railroad, so need to install reverse loop controllers (NCE’s AR10 module), so need to build something to protect them outside… so time to do some structure modeling! But wait, I have this set of windows set aside to build the little station at Gaines with… better do that first, THEN do the freelance structures to protect the auto-reversers. It makes sense, I swear!
I don’t know when I last scratchbuilt anything, let alone a structure, so I started simple with the clapboard sided Gaines station. It’s simply JTT and Evergreen styrene with vacu-formed windows and doors. I still need to figure out the roof, but the important part was picking out doors and windows that fit the look.
[ Guests cannot view attachments ]
[ Guests cannot view attachments ]
Needs much more work, but it should turn out well.
This is the station long before my era. Windows got removed over time, and the platform vanished after passenger service ended in the late 1940s.
With that distraction at a good pausing point, I dove into the two structures to protect the auto reversers. One would be at the edge of a staging yard, so a small tower is in order. The other is in the middle of nowhere next to a switch. So, I went for a signal equipment shed look. A bit of JTT corrugated siding and a flat roof are all I used.
[ Guests cannot view attachments ]
Then I got to work weathering it with rust-colored spray paint.
A fine mist of orange:
[ Guests cannot view attachments ]
Holding the can closer and making the nozzle spit unevenly to get larger uneven spots:
[ Guests cannot view attachments ]
Some fine mist and larger spots of a darker red:
[ Guests cannot view attachments ]
More red and orange spots, brushed downward to imply streaks:
[ Guests cannot view attachments ]
And now we’ve taken the structure from this:
To this:
[ Guests cannot view attachments ]
The whole idea is that the shack can be screwed down to this outlet box which I sealed up and installed pipe connections in. Old garden hose will serve as conduit for the wiring, and this signal shanty will be both an auto reverser and a junction box.
[ Guests cannot view attachments ]
I put it where it will go, and it should look great and provide a good sealed home for the electronics.
[ Guests cannot view attachments ]
I hope to get the tower done while it’s raining the next couple days, and get the railroad ready for continuous running on DCC this coming week!
-Steven