0 Members and 2 Guests are viewing this topic.
Those are 6.11 at my Lowes. But they're also about 6 " too short. I'm getting the pre-cut 9'
I'd almost be tempted to splice a 2 foot section .. since they aren't load bearing ..
because the amount of sawdust created is just ungodly. I'm really tired of cleaning the "outside" (the driveway) each time I splice.
Also, with the hopeful addition of adding a portion of Gettysburg to the new layout, the crews need somewhere to get their meals from before or after they make their set off for Gettysburg & Northern. @rickb773 had this up for sale so I snagged it. https://www.google.com/maps/@39.8333117,-77.2404424,263m/data=!3m1!1e3Years ago, the restaurant had the name on the roof, but after a remodel it was removed as seen above in the google maps images.
Drive your truck down here .. and sort through the pile .. (Attachment Link)
I wonder what the 3-star reviews are saying.
I see a miter saw in your latest picture. Why on earth were you cutting studs with a jig saw if you have a miter saw?You are using hot dip galvanized nails through the treated bottom plate, right?