0 Members and 2 Guests are viewing this topic.
OK, I’ll be the turd in the punch bowl that asks about the pitch of the covered log area roof draining right towards the main structure.
fired up the tree production line….60 evergreens under construction.....this'll bring the total to 22045 deciduous and counting, i've lost count of these -I think it's over 350 so far...….I have enough material on hand for about 25 - 30 more, then it's back to the fields for more....