0 Members and 3 Guests are viewing this topic.
Sweet! You'll have this layout ready to tear down and switch scales again in no time.
Another angle to demonstrate the how the staging yard squeezes in between the layout, the corner, and the entry door:DFF
Wow, using the space between un-rocked studs is pretty bold!
DaveThat sector plate looks real goodI like the pin pivot method rather than a screw tooI’m planning something very similar and also with MDF as it’s much more dimensionally stable and flat compared to a lot of the plywood out thereIf damp or humidity is something to consider, as the latter is in my case, I’m going to put a sanding sealer coat on the MDF before track fixing/ settingJust an idea.
And, as we all know, if you don't seal all six sides of MDF, you wasted your time. So, I'm going to be lazy and not seal it.
OK then, cost of dehumidifier vs. cost of sealing all sides of MDF...Place your bets!