Doodling out the benchwork plan. Not a finished product but farther than I’ve gotten with either this project or an expanded Juniata Division! I still have to figure out the cutaway for a 1’ tall representation of RGS Bridge 45A. The scenic base will be 4” of Styrofoam based on the other requirements for below-track scenery (primarily at Ophir for the station scene on a cliff edge and Bridge 45B). If I have room on the inside of the smaller lobe I may represent one of the smaller trestles in the milepost 46 series, but not the big ones.
[ Guests cannot view attachments ]
L-girders will be 1x3 with 1x2 cap. 1x2 joists with very thin plywood atop that capped with 4” of foam. Fascia will be 1/8” Masonite which means I’ll need 2x2 “cube” cleats at the end of the joists. 2x2 legs braced with 1x2 truss. I have leveling feet en route from Amazon.
3-day weekend ahead! One day will be for skiing but the other two...well, let’s just say there’s a trip to Lowes or Home Depot in there somewhere!