0 Members and 3 Guests are viewing this topic.
Thanks @Ed Kapuscinski, someday I`ll get the asshats down here, its a bit of a drive so I want people to at least be able to run a train!
Finished the middle module and started on the last straight module on this side once I'm done I'll be at 50%I also settled on using cobalt switch machines for tthe turnouts. I'm going to have to offset one of the point motors for this switch though!
Ever consider mounting the control topside, encasing it in a structure then running the linkage through tubing under scenery?Jeff
Alright guys,I need some help with what kind of bridge to do,Stone Arch-Customish build-i`m guessing I`ll just attach the "Archs" to the side of the elevated PlyME-Open Deck GirderCentral Valley Truss BridgeI was thinking of an Open girder om each side with a truss in the middle also.
I'll second that notion that the good old Atlas "viaduct" can be made to look Pennsy enough, particularly with the addition of the anti-spalling hardware.
Don't forget about @dougnelson 's sweet take on the Atlas Viaduct!
See the photo at the bottom of page 29:http://www.prrths.com/Keystone%20Modeler/Keystone_Modeler_PDFs/TKM%20No.%2097%20-%20Summer%202016.pdf
Already addressed.