This weekend had a lot of progress
I installed all of the switches for the switch machines and painted the holes black. I`m just giving the paint some time to dry before I put the switches back in place.
Hung all of the Fascia pieces and got most of the pin striping done.
Though I keep having random shrinkage issues with some of the pin striping
I`d say I`m 95% done with wiring and I have to go back with more screws to secure the fascia as it needs at least 10 per section.