0 Members and 1 Guest are viewing this topic.
Are there any examples of train elevators that operate with 8-9' trains? I would be interested to see this, even if I suspect it is overkill.Mark sent me a plan for a reverted loop on the lower level that would put all the turnouts at the front and give 5 X 12' staging tracks. Getting more than five tracks becomes a problem due to radius issues relative to the benchwork.Some metrics from the upper deck: 45 turnouts (about $1250 CDN) and 65 lengths of 36" Peco flex. I won't reuse my Atlas turnouts but if I do this I might consider handlaying turnouts. That many could amortize a jig or two quite reasonably or just do them by hand.