0 Members and 2 Guests are viewing this topic.
It will cross 5 tracks at ntrak spacing. The second will cross a road. It will be sized to look ok on the module crossing those tracks. The large span does have an imposing height to it. I wonder if there is an HO bridge that could be used and perhaps cut down the middle and narrowed. I got a nice article on scratching from Sirenwerks and could if given time make some pieces, but time is really short and a suitable stand in may be used for a while. And anyway the PRR signals attached are going to be hard to get as well so the big bridge with decent signals may be a phase 2 proposition.
Think that girder is 13 feet high?
Think that girder is 13 feet high?http://www.modeltrainstuff.com/Central-Valley-Model-Works-HO-72-Girder-Sections-p/cvm-1903-1.htmHO scale bridge
Yes it is skewed. Sirenwerks, thaks for that pic of the other end. That is a lot of detail I was missing. Followed the link and looked at his pics. That guy just made my life a lot easier.