0 Members and 4 Guests are viewing this topic.
Or you could do a build thread on here and we can all see
Installed 24 trestle bents at a 2% grade. Next I need to install all the latitudinal bracing and the fire barrel platforms. Lastly, it'll be painted and weathered to look like wood (hopefully!). I noticed after the photo one of the longest bents (closest) looked out of alignment, so I fixed it. Without the latitudinal bracing, the trestle's not stable enough to stand up on its own.Using Woodland Scenics hydrocal plaster castings for some of the tunnel portals and retaining walls. Unfinished on the right, weathered and stained with acrylic craft paints on the left. I used a surviving Midland Terminal Railway tunnel north of Cripple Creek as inspiration for the coloring.
Is that the Walthers/Heljan kit?Looks pretty sharp.
Nice stuff everyone. Dave that bridge looks like a fun project. Added some handrails, new decking on top, traffic guardrails and a few odds and ends to the bridge one of our guys (Nate Pierce) built for the Wisconsin Dells module. Still work to be done (guard rails, roadwork and on and on), but its coming along...Also been working on detailing the lumber yard...
That bridge and water scene blows me away. I just keep going back to look at it. That water level shot is my favorite. If only there were a way to model mist.