0 Members and 1 Guest are viewing this topic.
I think one actual rail is missing. I see one track rail and both guard rails.
Those are knockouts Pud ,I'm floored !
+1, love the subtlety.
Tonight before the snow starts I liberated over 4 pounds of Colorado dirt:It needs to be sifted, baked, and de-ironed (running a magnet over it to remove ferrous metals).Also bought and cut all of the extruded Styrofoam for the Colorado Midland tonight. The plan was to have the mainline at 5" above tabletop, but I might up that to 5.5" to make the bridges more dramatic. The wood trestle on the branch line would then be roughly 7" above the surface of the Frying Pan River (table surface).Tomorrow the fun starts...!
WHAT HAPPENS NEXT? STAY TUNED FOR MORE ADVENTURES IN WEATHERING!https://www.therailwire.net/forum/index.php?topic=35130.105