0 Members and 1 Guest are viewing this topic.
The Railwire is not your personal army.
Ryan: Learn something new every day! I always thought the pockets were on 24 ft centers, one pocket per car.
Ryan: I've read about the need to mix the ore. That's the big difference, in both design and operation, between iron ore docks and any other mineral transfer facility I've heard of. Even coal tipples usually only graded by size, so there was no mixing involved. I would think a model ore dock would be a layout in itself for someone who wanted to really operate it.
For things like ore docks and steel mills, I wonder if there might not be enough demand for "HO to N" conversions to justify a Shapeways designer, etcher or resin caster to bring out a line of parts.