0 Members and 2 Guests are viewing this topic.
Ed you can use what you learn here to help me as well.
That means that in your yard, what you'll want to do is have a track for each on layout destination/industry, so... (and remind me if I'm wrong here)1. Solo cup2. MMID interchange 3. Hampstead4. Yorkrail5. Downtown Hanover6. GETY 7. Bittinger8. Daltile9. AgCom10. Security
Man, this conversation is giving me flashbacks!
The key to having a good yard operation is fluidity and flexibility. Establishing a certain track as fixed position for any particular train is probably a mistake. You always end up having more cars coming in than you have room for, and another track that might be longer idling away, or vise versa.Better to determine which track will hold what destinations on an availability basis. This gives you flexibility. After awhile, you'll get a handle on which trains need more or less room to sort through, which helps you set targets, but without having a hard and fast identity for each class track.I used a very simple set up with a long clear acrylic bin that I could mark up with a dry erase marker to designate the destinations for each track. As the cars got sorted, the car cards went into the bin behind the track number. Having a single long bin without dividers made it easy to use a track for overflow, pre blocking for several destinations, etc.
That's pretty much what I was thinking though Ed, using your Windsor St yard as a model from the one time I sorted the yard for you. Since I'm only modeling the Hanover Sub, you can cut out the B702 that is the Highfield Turn, Q15/16 that is the intermodal that goes up to Chambersburg, the Lurgan turn that goes to Shippensburg and various other jobs that come out of Hagerstown and it's including switching/blocking.
Sweet, sounds like you're good to go then my man.Just make sure you're good on track lengths and start gluing!
I'm hoping to get some time this weekend to finalize the yard tracks and tack them down. And Ken made mention of something last weekend when were discussing our plan of attack, once I get these two sections finalized, I can simply run a loop of track around the wall and I can run trains again, and work on the helix and second level as time becomes available.
Wait till you start sanding!