It has been awhile since I posted last. Here is a track planning update.
I have moved away from doing Free-moN modules due to the limited space I have available in the garage. I wanted to have a layout that had more ops/play value than a couple of modules.
Over the last few months, I been sketching and brainstorming and finally created a cohesive draft trackplan as seen below. I sent this over to
@coldriver for comments a couple of weeks ago. Which resulted in converting the staging yard to an active yard allowing for more ops/play value at the cost of some run thru trains. I tried to maintain the feel of the prototype locations even though I had to make several compromises.
Here is the draft semi to scale trackplan:
Here is the scaled trackplan drawing in XTrkCAD:
Here is a version colored and drew buildings and etc:
General Layout Stats (As drawn):
- Min. Mainline Radius = 18"
- All Turnouts #7
- All track Atlas Code 55
- Track spacing 1.25"
Brief Summary of Ops Plan:
- Moscow Camden & San Augustine RR (MCSA): This will have 1 crew assigned to switch the plywood mill located at Camden and interchange with the SP.
- SP Corrigan Switcher: The job goes on duty at Corrigan and switches the plywood mill at Corrigan and then head over to Moscow to interchange with the MCSA. This job also blocks all loaded woodchip cars for pick-up by the termite train at Moscow.
- SP Lufkin Yard Job: Switches inbound and outbound cars and interchanges with ANR. Switches Lufkin Industries Foundry.
- Lufkin/Houston Local (alternates direction each ops session):originates/terminates at Lufkin, pick-ups cars blocked by Corrigan Switcher at Corrigan.
- Termite Train: Empties are set-out at Moscow and Lufkin and Loads are picked up in reverse.
- Rock Train: Unit rock train to/from Lufkin
I am open to comments on the trackplan. I already of some tweaks of Lufkin yard in mind.