0 Members and 2 Guests are viewing this topic.
Do you actually want to do any switching?
Ok, then get out and see some layouts.Can you make the timonium show here in Baltimore next month?
Good and interesting start. If you decide to actually operate Union Station, you have a location on the lower right that can serve as Ivy City by the use of cassettes. My initial recommendation is you have two ro three too many tracks heading into Union Station for the space. Cut down the number of tracks and they can be longer.
You could use the rail yard area as a spot to service the locomotives between runs and to also repair equipment, and that would be your switching ops in the plan.
I like this a lot better. The union station loco service buildings and wash rack are easily seen and photoed from Metro, so you could get a really nive representation going.