Author Topic: Conrail Windsor St Yard (York PA) Engineering Report  (Read 226330 times)

0 Members and 6 Guests are viewing this topic.

Dave V

  • Crew
  • *
  • Posts: 11193
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +9184
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #300 on: September 14, 2015, 10:37:53 AM »
0
Looking great, Ed!  Can't wait to see it when it's detailed out.

davefoxx

  • Crew
  • *
  • Posts: 11675
  • Gender: Male
  • TRW Plaid Member
  • Respect: +6800
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #301 on: September 14, 2015, 11:10:22 AM »
0
^What that guy said.  I also look forward to an actual ops session on your layout one day, since we never got to do ops with this yard installed at Lee's house.

DFF

Member: ACL/SAL Historical Society
Member: Wilmington & Western RR
A Proud HOer
BUY ALL THE TRAINS!

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 24614
  • Head Kino
  • Respect: +8974
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #302 on: September 14, 2015, 01:32:26 PM »
0
Ha. Me too! That's one of the many reasons I'm so glad I've been able to re-home it.

wm3798

  • Crew
  • *
  • Posts: 16081
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +6321
    • Western Maryland Railway Western Lines
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #303 on: September 15, 2015, 02:00:09 PM »
0
I feel like there's an article coming on...  I have quite a catalog of photos of the construction of the original configuration...  I love what you're doing with it.

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

Philip H

  • Crew
  • *
  • Posts: 8896
  • Gender: Male
  • Respect: +1631
    • Layout Progress Blog
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #304 on: September 15, 2015, 02:26:23 PM »
0
^What that guy said.  I also look forward to an actual ops session on your layout one day, since we never got to do ops with this yard installed at Lee's house.

DFF

Actually if my foggy memory serves we did run the yard during the final ops session before it was dismantled.  Not sure who was yard master - though I do recall getting a stern talking to for needing to run through A/D to get to the junction on the far side because a switch was set wrong or something . . .
Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.


Dave V

  • Crew
  • *
  • Posts: 11193
  • Gender: Male
  • Foothills Farm Studios -- Dave's Model Railroading
  • Respect: +9184
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #305 on: September 15, 2015, 03:49:47 PM »
0
I love what you're doing with it.

Lee

He really does need to tear out that horrible code 55 track and replace it with some nice geometrically rigorous Unitrack.








 :trollface:

Philip H

  • Crew
  • *
  • Posts: 8896
  • Gender: Male
  • Respect: +1631
    • Layout Progress Blog
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #306 on: September 15, 2015, 03:58:10 PM »
0
He really does need to tear out that horrible code 55 track and replace it with some nice geometrically rigorous Unitrack.


 :trollface:

@Dave Vollmer ladies an gentlemen - he'll be here all week! :facepalm:
Philip H.
Chief Everything Officer
Baton Rouge Southern RR - Mount Rainier Division.


Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 24614
  • Head Kino
  • Respect: +8974
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #307 on: September 15, 2015, 04:11:40 PM »
0
I feel like there's an article coming on...  I have quite a catalog of photos of the construction of the original configuration...  I love what you're doing with it.

Lee

I hope so. That'll be fun. And I'm glad you're into it. I do try to keep the quality up so as to not disappoint the original owner!

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 24614
  • Head Kino
  • Respect: +8974
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #308 on: September 15, 2015, 04:11:52 PM »
0
He really does need to tear out that horrible code 55 track and replace it with some nice geometrically rigorous Unitrack.








 :trollface:

Lol.

seusscaboose

  • The Pitt
  • Crew
  • *
  • Posts: 2060
  • Respect: +194
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #309 on: September 15, 2015, 08:37:16 PM »
0
Actually if my foggy memory serves we did run the yard during the final ops session before it was dismantled.  Not sure who was yard master - though I do recall getting a stern talking to for needing to run through A/D to get to the junction on the far side because a switch was set wrong or something . . .

I remember going there and STAGING the yard before it was torn out

But technically I thought we never operated it with car cards


Maybe I'm tripping over details

But I thought lee always lamented the fact he didn't operate it
"I have a train full of basements"

NKPH&TS #3589

Inspiration at:
http://nkphts.org/modelersnotebook

wm3798

  • Crew
  • *
  • Posts: 16081
  • Gender: Male
  • I like models. She likes antiques. Perfect!
  • Respect: +6321
    • Western Maryland Railway Western Lines
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #310 on: September 16, 2015, 08:26:49 AM »
0
I operated it quite a bit, actually. 





I used that acrylic holder as a sorter, using a dry erase marker to label tracks for flexibility.  The utility of the A/D tracks, the runner track and the switch leads all came about as a result of the collective brain power of the Railwire. 

Now that you're all fat and happy with a high dollar job, I've already started designing your new basement around the yard.  Let me know if Terri wants a bedroom or something upstairs.  I'll see what I can work out.

Lee
Rockin' It Old School

Lee Weldon www.wmrywesternlines.net

Ed Kapuscinski

  • Global Moderator
  • Crew
  • *
  • Posts: 24614
  • Head Kino
  • Respect: +8974
    • Conrail 1285
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #311 on: September 16, 2015, 09:37:01 AM »
0
Now that you're all fat and happy with a high dollar job, I've already started designing your new basement around the yard.  Let me know if Terri wants a bedroom or something upstairs.  I'll see what I can work out.

Excellent. I don't start till Monday though... but I think that might be in the cards in a bit (probably after I "finish" the layout, but before I have an Ops session... there are traditions to be upheld!).

seusscaboose

  • The Pitt
  • Crew
  • *
  • Posts: 2060
  • Respect: +194
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #312 on: September 16, 2015, 11:46:45 AM »
0
Red X strikes again
"I have a train full of basements"

NKPH&TS #3589

Inspiration at:
http://nkphts.org/modelersnotebook

davefoxx

  • Crew
  • *
  • Posts: 11675
  • Gender: Male
  • TRW Plaid Member
  • Respect: +6800
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #313 on: September 16, 2015, 12:00:26 PM »
0
Red X strikes again

Works for me.  Check your settings.

DFF

Member: ACL/SAL Historical Society
Member: Wilmington & Western RR
A Proud HOer
BUY ALL THE TRAINS!

GaryHinshaw

  • Global Moderator
  • Crew
  • *
  • Posts: 6330
  • Respect: +1856
Re: Conrail Windsor St Yard (York PA) Engineering Report
« Reply #314 on: September 16, 2015, 12:32:04 PM »
0
Works for me too.  Ed, are you planning to use car cards?