Ops session or are we gutting the layout for transport again?
Well, given the time I had fighting with the switch at CP LOUCKS yesterday, you might just be shoveling out ashes... lol.
But no, the plan is for the 2nd to be the big last hurrah for it. I have a few aesthetic things I want to finish up and some gremlins to work out operationally, but that's the plan.
Then it's onto the next thing.
I'm thinking that, during the moving period, it's going to be a PC TTRAK layout. I already have that corner and a module currently in progress with my dad.
After THAT, we're looking at O scale "railroading" (it's gonna be fun) and I'm thinking an N scale display loop (with as few turnouts as possible).